Spider Plus provided the lifting equipment for the installation of structural steel and GRC panels at a restricted access site in Riyadh. The project required precise positioning and safe handling in a very tight working area.
The site had limited access, which meant large cranes could not be used. The team needed to:
Lift steel elements up to 1,400 kg
Install GRC panels weighing between 500 kg and 800 kg
Work safely within confined spaces
Maintain high accuracy and safety standards
Spider Plus used compact and powerful spider cranes to complete the job safely and efficiently:
Spider Crane 1006 installed steel elements weighing up to 1,400 kg
Two Spider Crane 706 units installed GRC panels weighing 500β800 kg
Their compact size and strong lifting capacity allowed smooth operation in areas where traditional cranes could not work.
Safe lifting in restricted spaces
Precise placement of steel and GRC panels
Smooth workflow with minimal disruption
High safety and quality maintained throughout
The right equipment helped the team complete the project successfully despite the tight site conditions.
This project shows that even in confined spaces, the right lifting solution ensures safe, efficient, and accurate results. Spider Plus continues to deliver reliable performance where conventional equipment cannot operate.
Working in a tight or challenging site? Let Spider Plus provide the right lifting solution for your project.
Contact us today:
π UAE: +971 4 881 7775 | βοΈ enquiries@spiderplus.ae
π KSA: +971 4 881 7775 | βοΈ enquiries@spiderplus-ksa.com
Β
Warehouse 17, Alserkal Complex Dubai Investment Park 1, Dubai, UAE
EXIT 17, Haroun Al Rasheed St. RIYADH, KSA
Β© 2026 Spider Plus