Door Pivot Upgrade

Client
Albertini
Project Location
Apple Store, Mall of the Emirates, Dubai, UAE
-
The Problem
The client required several pieces of glass to be lifted, all weighing over 1.5 tonnes, in an extremely space restricted environment. There was exceptionally low head room, load restrictions on the floor, and distinct constraints on conventional lifting methodology.
-
The Solution
Spider Plus performed initial site inspection and verified suitable equipment to perform the task. We provided an access platform, a URW 376 Spider Crane and a 2.6 tonne vacuum glass lifter. Access was complex and ground specifications and guidelines needed to be strictly adhered to. The job was completed ahead of schedule in 5 days, 1 day sooner than expected.
-
Learning & Development
Spider Plus is now very familiar with the guidelines and restrictions in place working within commercial malls and shopping centers in the UAE.